Orange!


31/10/01 Picking the kit up.

01/11/01 Unpacking.

02/11/01 Pedals and pipes.

05/11/01 Diff and rear suspension.

08/11/01 Front suspension, steering etc.

12/11/01 Fuel tank, wiring, handbrake, gear linkage...

14/11/01 Engine fitting.

21/11/01 Cooling, wiring, dummy prop

03/12/01 Oil cooler, battery, small jobs

04/12/01 Engine mount work, centre bearing, props

06/12/01 Reverse ring gear, cushdrive, seats

13/12/01 Failed attempt at new mount for water pump.

18/12/01 Water pump core plug, props, etc..

02/01/02 Bodywork fitting

08/01/02 Centre bearing mount, dash loom

15/01/02 Dash loom, dash

22/01/02 Centre bearing mount, seats, dash, aero

08/02/02 Misc bits...

14/02/02 Cooling, carbs, started engine..

22/02/02 Wheels/tyres, suspension setup.

25/02/02 Roll-out...

13/03/02 SVA

24/04/02 New clutch, electric reverse etc